8mm Interlocking Forshore Estate Ikoyi

This project involved procuring, preparing, and precisely installing premium 8mm heavy-duty interlocking stones across 492 square metres at Acacia Drive. The scope included professional site clearing, sub-base excavation, compaction, and sharp sand layering, followed by systematic laying of the interlocking blocks.

Edge restraints and joint-sealing sand were applied to ensure maximum structural stability. The project has been fully executed to engineering standards and is ready for formal handover.

Project Goals:

  • Deliver Durable Infrastructure
  • Optimize Surface Drainage
  • Enhance Visual and Property Value
  • Execute Seamless Project Delivery

Project Info

  • Client:

    Foreshore Estate Ikoyi

  • Category:

    Construction

  • Start Date:

    15 May, 2018

  • End Date:

    13 June, 2018